Smeg KFV92DN Manuel d'instructions Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 10
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
EN
1
13
11
12a
306
X
116
1÷2
116
650 min.
7.2.1
INSTALLATION
Wall drilling and bracket fixing
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
centre of the area in which the hood will be installed.
Draw a horizontal line at 650 mm above the hob.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit align-
ing the centre (notch) with the vertical reference line.
Mark the wall at the centres of the holes in the bracket.
Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the
upper chimney section supplied), aligning the centre (notch) with the vertical line.
Mark the wall at the centres of the holes in the bracket.
Mark a reference point as indicated at 116 mm from the vertical reference line and 306 mm
above the horizontal reference line.
Repeat this operation on the other side.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Fix the lower bracket 7.2.1 using the 12a screws (4,2 x 44,4) supplied.
Fix the upper bracket 7.2.1 and the air outlet connection support 7.3 together using the 2
screws 12a (4,2 x 44,4) supplied.
Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap
of 5-6 mm between the wall and the head of the screw.
Vue de la page 5
1 2 3 4 5 6 7 8 9 10

Commentaires sur ces manuels

Pas de commentaire